Glasgow Case Study

GEPB’s demand response program helped reduce impact on peak demand charges and reduce peak load. This integrated smart device program included water heaters, thermostats, and residential batteries, saving average households money.

Download this case study to read more about:

icon of chat bubble

The challenge: how to integrate multiple disparate devices into one program, while optimizing for overall peak load times.

icon of chat bubble

The solution: TVA Smart Energy Technology (SET) program 330 residents, using Virtual Peaker's SAAS platform.

icon of chat bubble

The results: a popular customer program that optimized peak load times and distributed GEPB energy resources.